Airfield surveying.

We provide survey services on active airfields, including construction staking, control, topographic and as-built survey on taxiway and terminal projects at LAX. The work is phased around live operations and built to FAA requirements. It is the same discipline we bring to land development, carried out where the tolerance for error is considerably smaller.

What we do.

Construction staking

Horizontal and vertical control

Topographic and as-built surveys

Utility mapping

Layout for airfield lighting, signage and drainage

Airfield Surveying

Related work.

LAX Taxiway P, Los Angeles World Airports.

A new 3,600-foot taxiway connecting the north and south airfields, across roughly 25 acres of existing taxiway. Surveying for Sully-Miller Contracting, November 2019 to March 2021.

LAX ITF-West, Los Angeles World Airports.

The airport’s 4,500-stall intermodal transportation facility. Project control, utility mapping, construction layout and as-builts for Swinerton Builders.

Talk to us about your airfield project.